Bloomberg Project

Period: July 2014 – May 2017
Main Contractor: Sir Robert McAlpine
Facade subcontractor: Primary Subcontractor
Secondary Subcontractor: Cornelius UK Ltd

Bloomberg Project

The development comprises two high-grade specification office buildings in the City of London.

It will include some retail units at ground floor level, and a new entrance to the London Underground, Bank Station. Bloomberg London will also host a permanent public exhibition on the Temple of Mithras which was originally uncovered on Walbrook in the 1950s.

Main Cladding installation on South and North Buildings:

  •   Ground floor to Level 2 – Installation of complex curved “stick” façade
  •   Cloaking with bronze panels of all RHS mullions, transoms and central steel columns
  •   Installation of retail doors
  •   External bronze fins
  •   Acrylic fins
  •   Horizontal brass nosing
  •   Perimeter brass soffit panels