Telehouse North 2

Period: January 2016 – November 2016
Main Contractor: Mace Group Ltd
Facade subcontractor: Prater UK Ltd
Secondary Subcontractor: Cornelius UK Ltd

Telehouse North 2

Telehouse North Two is an ultra-modern 7 floor data centre building adjacent to Telehouse North and Telehouse East and securely anchored as part of the Telehouse Docklands Campus. Across the data floors cabinets are housed in “PODS” with hot aisle containment (the first such use on the Telehouse campus) and each cabinet benefits from 2(n+1) power feeds. A typical floor will support just over 500 cabinets each.

The site forms part of the former East India docks that was in-filled in the 1960s and been undeveloped since then.

Installation consisted of the following:

  • High level fascia band roof
  • Installation of panels, corner panels,
  • Glazing north elevation
  • Euro cladding
  • IAC Gantry
  • IAC Gantry Canopy
  • Window Jamb
  • Horizontal profile cladding
  • Setting upstand and installing EPDM
  • Install panels for parapets
  • Install flashing to opening doors
  • Install flashings accessing cradle
  • Install decking